Client: DAMAC Properties | Location: Dubai, UAE | Year: 2014–2017
EPS completed full structural, architectural, and MEP works for 60 townhouses.
The scope included slab casting, DEWA substation works, firefighting systems, irrigation, and hardscape execution.
All labor, equipment, materials, and QA/QC support were provided under an ISO-certified Integrated Management System. The project was delivered in full alignment with client specifications, safety KPIs, and local authority compliance requirements. During execution, the contractor maintained detailed documentation, conducted daily safety briefings, logged progress reports, and prepared comprehensive as-built records. Seamless stakeholder coordination ensured timely achievement of all handover milestones.
In the residential and civil domain, the team worked in close coordination with municipal authorities, developers, and design consultants to guarantee compliance with Dubai Municipality and DEWA standards. Projects involved multi-phase activities such as excavation, concrete placement, waterproofing, MEP integration, façade cladding, lift shaft construction, fireproofing, and landscaping.
Special attention was given to managing multiple subcontractors, enforcing work-at-height protocols, and reducing disruption within urban zones. High-end finishing was delivered for lobbies, corridors, apartments, and retail spaces, with a strong focus on energy efficiency and sustainable design practices.
Client: DAMAC Properties | Location: Dubai, UAE | Year: 2016–2019
EPS completed full structural, architectural, and MEP works for 75 townhouses. The scope included slab casting, DEWA substation works, firefighting systems, irrigation, and hardscape execution. All labor, equipment, materials, and QA/QC support were provided under an ISO-certified Integrated Management System, ensuring full compliance with client specifications, safety KPIs, and local authority regulations.
Throughout the project lifecycle, the team maintained detailed documentation, conducted daily safety briefings, logged construction progress, and submitted comprehensive as-built records. Stakeholder coordination was effectively managed to meet all key handover milestones on time.
Work in the residential and civil domain included close coordination with municipal bodies, developers, and design consultants to align with Dubai Municipality and DEWA standards. Project execution involved complex sequencing across excavation, concrete works, waterproofing, MEP integration, façade cladding, lift shaft construction, fireproofing, and landscaping.
Special attention was given to managing multi-discipline subcontractors, enforcing work-at-height protocols, and minimizing disruptions within urban settings. Final delivery featured high-end finishes for lobbies, corridors, residential units, and retail shells, with a strong emphasis on energy efficiency and sustainable design.
Client: Jumeirah Holding | Location: Dubai, UAE | Year: 2015–2017
EPS delivered civil and structural works for two five basement floors +G+23 typical floors residential towers (~22,000 m² each), including raft foundations, reinforced concrete frame, architectural blockworks, and stair/lift cores. The project included full MEP infrastructure, DEWA substation works, rooftop water tanks, curtain wall glazing, and composite panel cladding.
Also managed waterproofing, floor finishing, access control, and testing & commissioning of all services.
Each residential development involved deep coordination between structure, MEP, and finishing trades. EPS implemented phased execution plans to meet critical path milestones, coordinated material logistics, and supervised site safety protocols in line with Dubai Civil Defence and international HSE best practices.
In high-rise tower projects, EPS maintained vertical construction cycles through strict QA/QC, installed fire-rated shafts, riser ducts, pressure-tested plumbing systems, and completed mock-up apartments for client approval prior to full rollout. For community-based housing, the company focused on modularity, cost-efficiency, and user-centric infrastructure planning.
Client: Crown Prince Court | Location: Abu Dabi | Year: 2016–2018
Complete construction of the Citizen Affairs Division Building in Abu Dhabi, commissioned by the Crown Prince Court. The facility includes two basements, a ground floor, and three upper floors, designed to accommodate administrative and public service functions.
Client: ADNOC | Location: Ruwais, Abu Dabi | Year: 2012–2013
EPC execution of a dedicated custody transfer gas metering system between GASCO and ADWEC, including design, procurement, installation, testing, and commissioning.
Client: Ras Gas| Location: Qatar | Year: 2012–2013
Engineering, Procurement, and Construction (EPC) of an 11 kV underground power cable link between the Ras Laffan City Substation and the RasGas Substation, executed as part of the Barzan Gas Development Project in Qatar.
Client: Nakheel | Location: Dubae UAE | Year: 2010–2012
Construction of two clusters of residential buildings. Each cluster consists of a common semi- basement for three buildings, three ground floors and five-storey buildings with total built up area of 100,000 sq.m, including all MEP works.
Client: Sharjah National Oil Corp. | Location: UAE | Year: 2020–2022
Construction of a full-scale Administration Complex with a total built-up area of 15,533 m²
Client: IPIC / ADCOP | Location: UAE | Year: 2017–2019
Mechanical and E&I upgrades to booster pump stations, including new ESD valve skids, flow meter loops, PLC panels, battery rooms, civil refurbishment and telecom loop reconnections.
Client: Dana Gas | Location: Sharjah | Year: 2016–2017
Construction of 14 residential buildings serving as bachelor accommodation, including all MEP works.
Client: ADNOC | Location: Abu Dhabi UAE | Year: 2017–2020
Installation of four new gas pipelines to be laid underground in the causeway between Mubarraz Island and the AR site terminal.
Client: SATORP | Location: Saudi Arabia | Year: 2022–2024
The SATORP project involved engineering and construction of four 20,000 m³ storage tanks for aromatic products. EPS managed bottom welding, shell plate erection, internal coatings, installation of radar level gauges, and construction of manifold piping connected to the tank inlet/outlet lines with associated instrumentation.
Still have questions?
Leave us your email, and our manager will contact you shortly.
EPS – Engineering Project Solutions
Engineering trust. Delivering energy.
Founded in 2010, headquartered in Dubai, EPS is a leading EPC contractor delivering oil & gas and civil construction projects across the GCC and CIS.